Regulatory compliance platform · PMGD solar

All of your CEN compliance,
at a single point of interconnection.

CEN Compliance integrates real-time telemetry (Pulse/SITR), COMTRADE fault records (Pulse/Vault) and protection settings (NTCO 2026) on one hardware base: the NOJA OSM27 + RC10 recloser at the POI and the Pulse-iris industrial appliance. A generic solution for entire PMGD portfolios.

✓ Field-proven · PMGD Verona 3 regulatory fronts · 1 appliance ~16 plants standardized on NOJA per typical portfolio Plan filed with the CEN · 06-Jul-2026 Potential saving ~US$15k per recloser · alternative under CEN validation
01

The regulatory calendar won't wait

Three requirements from the Coordinador Eléctrico Nacional converge on PMGD plants between 2026 and 2027. CEN Compliance addresses them as a single program.

15-JUL-2026
ConectaCEN work plan
Letter DE 03474-26 · COMTRADE adaptation plan
FILED
19-AUG-2026
RI protection settings
NTCO 2026 Art. 10-5 · 30/90-min frequency bands
IN EXECUTION
30-NOV-2026
Standardized COMTRADE
IEEE C37.111 · standard files and nomenclature
PIPELINE LIVE
31-MAR-2027
Automatic extraction
External repository + the CEN's SLRP (AWS S3)
DEMONSTRATED
SITR
Real-time telemetry
CNE Res. 151 · driven by each utility's published requirements (NTCO Art. 7-8)
DESIGN READY
02

One hardware base, three solutions

The PMGD fleet is already homogeneous at the POI: a Schneider ION meter plus a NOJA recloser. CEN Compliance adds a single device — Pulse-iris — and turns that installed base into verifiable compliance.

NOJA OSM27 + RC10

The POI recloser: RI protections, breaker status, COMTRADE oscillography and the IEC 61499 app for the new frequency bands.

DNP3 · IEC-104 · Modbus TCP · FTP
REL-02 (CMS) → REL-04 2027 (native 2013)

Pulse-iris

Fanless industrial appliance in the POI cabinet. Runs the three compliance agents: SITR outstation, GridVault and protections audit.

Intel N150 · 2× 2.5GbE · 2× RS-232/485
TPM 2.0 · watchdog · −20 to 50 °C · 9–36 V
supplier: Inctel (inctelpc) · 3-year warranty

ION 7400 / 8650 meter

Class 0.2S at the POI. Direct source of net P, Q, V and f for the SITR — no additional transducers.

DNP3 · Modbus TCP · IEC 60870-5-104
present in 100% of the fleet (as-built)

Site support

The three complements the regulation demands and that are missing at almost every plant today.

GPS clock ±100 µs (IRIG-B/NTP)
UPS ≥ 6 h (Art. 9)
Teltonika RUTX11 4G/VPN router
03

Three modules, one program

Each module was born as an independent, proven solution. CEN Compliance consolidates them on the same appliance, the same portal and the same evidence trail.

MODULE · PULSE/SITR

Real-time telemetry

Integration into the Coordinator's SITR via the distribution utility (CGE / Enel): a DNP3 / IEC-104 outstation fed by the ION meter and the NOJA recloser.

  • Net P, Q, V, f at the POI + breaker status (D1)
  • Equivalent-plant reporting (Art. 19) and grouped alarms (Art. 30)
  • GPS ±100 µs · 6-h UPS · redundant link ≥99.5%
  • As-built inventory of 6 Obton plants audited
sitr.portal-ienergia.live ↗
MODULE · PULSE/VAULT

COMTRADE fault records

Automatic extraction, IEEE C37.111 validation and standardization of fault records, with upload to the CEN's SLRP repository. Field-proven at PMGD Verona.

  • Event → FTP extraction ≤ 1–2 min (CEN requirement)
  • Validator: 16 samples/cycle · 25/15/10 cycles · UTC · primary units
  • Signal dictionary + standard renaming
  • Binary signals in dual format · SLRP sync (AWS S3)
reclosers.portal-ienergia.live ↗
MODULE · PROTECTIONS

RI settings · NTCO 2026

Closure of the frequency gap (30/90 min vs the native 120 s) with the Comulsa/NOJA IEC 61499 app, plus inventory, traceability and evidence per plant.

  • Per-plant settings inventory and factory certificates
  • IEC 61499 app on the REL-02 — no hardware change
  • Compatibility confirmed: CMS 3.16/3.17 · FW 1.27/1.28
  • Secondary-injection protocols + Art. 9-16 traceability
ajustesproteccion.portal-ienergia.live ↗
04

Architecture

One appliance at the POI, three flows to the Coordinator. The per-module diagrams show the detail of each front.

CEN Compliance — Integrated architecture One appliance at the POI covers the three regulatory fronts of the Coordinador Eléctrico Nacional POINT OF INTERCONNECTION (POI) · PMGD NOJA OSM27 recloser + RC10 control RI protections (27/59/81/78) · POI breaker COMTRADE oscillography · binary signals IEC 61499 app (30/90-min NTCO 2026 bands) DNP3 · IEC-104 · Modbus TCP · FTP ~16 standardized plants · Eaton/Tavrida adapters Schneider ION 7400 / 8650 meter Net P, Q, V, f at the POI · class 0.2S DNP3 · Modbus TCP · IEC 60870-5-104 PULSE-IRIS · industrial appliance Fanless · Intel N150 · 2× 2.5GbE · 2× RS-232/485 TPM 2.0 · watchdog · −20 to 50 °C · 9–36 V ▸ Pulse/SITR agent — real-time outstation ▸ Pulse/Vault agent — COMTRADE ▸ Protections agent — RI audit Site support GPS ±100 µs · UPS ≥6 h · 4G/VPN router (RUTX11) PULSE/SITR — REAL TIME P/Q/V/f telemetry + breaker status DNP3 / IEC-104 outstation with quality flags, deadband and GPS ±100 µs → Utility SCADA (CGE / Enel) → re-transmitted to the CEN's SITR age ≤5 s · sampling ≤2 s · ≥99.5% PULSE/VAULT — OSCILLOGRAPHY Event → FTP extraction ≤ 1–2 min IEEE C37.111 validation · signal dictionary · standard renaming Binary signals in dual format → Pulse/Vault repository + dashboard field-proven: PMGD Verona PROTECTIONS — NTCO 2026 30/90-min bands via IEC 61499 app Settings + certificates inventory Art. 9-16 traceability vs ICC Secondary-injection protocols Art. 10-5 deadline: 19-Aug-2026 COORDINATOR (CEN) SITR CNE Res. 151 via utility (Art. 10) SLRP (AWS S3) Letter DE 03474-26 fault-record repository ConectaCEN Letters DE 01896-26 / plans and evidence iEnergia portal: fleet dashboards, compliance evidence and per-coordinado reports — on the same infrastructure as the three modules. Hardware anchor: NOJA OSM27 + RC10 (POI) · Pulse-iris (edge) · ION 7400/8650 (metering) — repeatable across the whole PMGD fleet.
Diagram · Pulse/SITR module — real-time telemetry
Pulse/SITR module — Real-time telemetry to the Coordinator PMGD reports via the distribution utility (Art. 10) · SITR Technical Annex, CNE Res. 151 FIELD — POI AND PLANT ION 7400 / 8650 meter (POI) Net P, Q, V, f (A1 A2 A5 A6) DNP3 · Modbus TCP · IEC 60870-5-104 NOJA OSM27 + RC10 recloser POI breaker status (D1) · alarms DNP3 · IEC-104 · DI 52a/52b Sungrow / SMA inverters Gross P, Q (A3 A4) · available power Modbus TCP (V10 / SMA profile) Weather station SMP10-A (POA) · Lufft WS600 · PT1000 A8–A12: irradiance, Tmod, Tamb, wind Modbus RTU → USR / Moxa PULSE-IRIS · SITR OUTSTATION Gateway / concentrator Field Modbus / DNP3 master Point map · deadband Quality flags · data age ≤ 5 s Equivalent plant (Art. 19) · alarms (Art. 30) GPS synchronization ± 100 µs IRIG-B / NTP · UTC-0 Backup and links UPS ≥ 6 h (Art. 9) Redundant link: fiber/MPLS + 4G/APN Availability ≥ 99.5% IEC-104 / DNP3 UTILITY SCADA CGE · Enel · Chilquinta Concentrates the PMGD's signals and re-transmits to the Coordinator SITR — CEN Real-Time Information System Coordinador Eléctrico Nacional Quality: data age ≤5 s · sampling ≤2 s · ANSI class 2 · 16 bit · GPS ±100 µs UTC-0 · UPS ≥6 h · link ≥99.5% The fleet already has ION meter + NOJA recloser at every POI: the gap is outstation + GPS + 6-h UPS + link — configuration, not major hardware.
Diagram · Pulse/Vault module — COMTRADE fault records
Pulse/Vault module — Automated COMTRADE fault records CEN letter DE 03474-26 · extraction, validation, standardization and SLRP repository RECLOSER AT THE POI NOJA OSM27 + RC10 / RC-10ES COMTRADE 1999 oscillography 1600 sps = 32 samples/cycle Triggered by any protection element FTP /COMTRADE/osc (ProFTPD) Modbus TCP 502 (NOJA outstation) Binary signals Modbus watcher: 17 points every 2 s Trip · pickup · autoreclose (AR) Other brands (adapters) Eaton NOVA / Form 6 (ProView) Tavrida REC25 (Telarm) · manual upload event → immediate pull PULSE-IRIS · PULSE/VAULT AGENT 1 · Event detection Modbus watcher triggers the FTP extraction Upload ≤ 1–2 min after the event (CEN req.) 2 · IEEE C37.111 validation ≥16 samples/cycle · ≥25 cycles (15 pre / 10 post) UTC · primary units · CFG + DAT [PASS]/[WARN]/[FAIL] report 3 · Standardization Signal dictionary + channel renaming StartDate,StartTime,Substation,PMGD_name Binary signals in dual format 4 · Local buffer + audit trail Idempotent registry · retries · SHA-256 HTTPS PULSE/VAULT CLOUD Repository + dashboard COMTRADE records per plant Live compliance status Evidence and reports Event log · validation results Monthly report per coordinado aws s3 sync SLRP — CEN (AWS S3) Digital certificate per coordinado raw/{CN}/... · temporary credentials Field-proven: PMGD Verona (NOJA RC10) — real records extracted, validated and standardized; full pipeline demonstrated to the CEN (06-Jul-2026). 2013 path: REL-04 processor (2027) — native IEEE C37.111-2013 COMTRADE with embedded binaries, read-only FTP + IEC 61850 MMS (Comulsa).
Diagram · Protections module — RI settings NTCO 2026
Protections module — RI settings per NTCO 2026 Art. 9-11 (Table 6, frequency) · Art. 10-5 (deadline 19-Aug-2026) · Art. 9-16 (traceability vs ICC) NTCO FEB-2026 REQUIREMENT Frequency: from seconds to minutes 51.0–51.5 Hz → 90 min (5,400 s) 48.0–49.0 Hz → 90 min (5,400 s) 47.5–48.0 Hz → 30 min (1,800 s) Ride-through requirement after the Feb-2025 blackout · aligned with NTSyCS and ENTSO-E RfG Also ROCOF must be disabled (mandatory) Anti-islanding ≤ 2 s · voltage unchanged THE GAP No relay in the fleet can time 1,800 / 5,400 s: NOJA REL-02: max 120 s · PL-70: max 600 s Fleet currently set to NTCO 2024 (90 s) GAP CLOSURE — NOJA FLEET IEC 61499 app (Comulsa / NOJA) Function blocks on the current REL-02 No hardware change Compatibility confirmed by Comulsa: CMS 3.16/3.17 · firmware 1.27 / 1.28 OK Field validation Secondary injection inside frequency bands Results protocol (~5 business days) UV 50% Vff via FW 1.18 generic functions Exceptions (adapters) Eaton NOVA / Form 6 — Calle Larga, Llancay, Aldebarán* · Tavrida REC25 — Salerno vendor inquiries in progress CONTINUOUS AUDIT · PULSE-IRIS Per-plant settings inventory CMS exports checked vs Tables 5/6 Factory certificates (relay serials, firmware) · ~16 NOJA plants Art. 9-16 traceability Verify no deviations from the authorized ICC · detect serial swaps and as-built divergences Compliance evidence Injection protocols + signed exports → utility (CGE/Enel) and CEN (letter DE 01896-26: verification schedule) Highly standardized fleet: NOJA OSM27 + RC10/RC-10ES at ~16 plants → a single app closes the gap for nearly the whole fleet. Schedule risk managed: Comulsa availability "September 2026" with PO — gap-management plan with utilities and the CEN.
05

CEN compliance reference

Each module answers official communications from the Coordinator and the CNE, with written feedback from the manufacturer (Comulsa / NOJA Power). This is the platform's regulatory traceability.

ReferenceWhat it requiresResponse / feedbackModule
Letter DE 03474-26
22-May-2026
Standardized COMTRADE (IEEE C37.111) and automatic extraction of PMGD oscillography. Plan by 15-Jul-2026; standard format by 30-Nov-2026; automatic extraction + repository by 31-Mar-2027. CEN (P. Escobar, 22-Jun-2026): technical questions routed to dmap@coordinador.cl. CEN presentation 06-Jul-2026: SLRP architecture = digital certificate per coordinado + AWS S3 (aws s3 sync). iEnergia filed its operational solution with Verona evidence and 7 technical questions (reply pending). Pulse/Vault
Letter DE 01896-26
27-Mar-2026
Adaptation of PMGD and inverter protection settings to NTCO 2026; submission of a verification schedule. Circular to ~865 companies. iEnergia compiled the complete per-plant settings inventory (CMS exports + factory certificates) and manages the schedule with the utilities. Protections
NTCO Feb-2026
CNE Res. 69 · O.G. 19-Feb-2026
Table 6 (Art. 9-11): 30/90-min ride-through in the frequency bands; ROCOF disabled; 6-month deadline (Art. 10-5 → 19-Aug-2026). Comulsa (letters 03/10-Jul, reply 05-Aug and meeting 11-Aug-2026, E. Lorber): the solution is an fboot file — a program in the RC10's logic based on IEC 61499 function blocks — on the REL-02, no hardware change; CMS 3.16/3.17 and FW 1.27/1.28 compatible. Comulsa supplies the file + on-site testing (~US$2k per recloser); alternative: confirm with the utility (CGE/Enel) whether testing is required — if not, it's just uploading the file. Protections
CNE Res. 151
SITR Technical Annex · O.G. 02-Apr-2025
Technical parameters for sending data to the SITR: data age ≤5 s, GPS ±100 µs, 6-h UPS, link ≥99.5%. PMGD report via the utility (NTCO Art. 7-8: the utility publishes its requirements and cannot demand a higher standard than its own). Audited v3.0 integration design for 6 plants: the gap is outstation + GPS + UPS + link — configuration on existing hardware, not a premium RTU. Point-by-point SITR compliance verification per plant: in progress. Pulse/SITR
COMTRADE 1999 → 2013 The CEN prefers IEEE C37.111-2013; the current RC10 (REL-02) records in the 1999 format. Comulsa (08-Jun, re-confirmed in the 11-Aug-2026 meeting): the REL-02 cannot be upgraded to 2013 — a design limit; it requires the REL-04 hardware upgrade (date TBD — end of 2026 / 2027): drop-in, COMTRADE 2013 with embedded binaries, read-only FTP + IEC 61850 MMS. iEnergia's alternative: the Pulse/Vault pipeline standardizes the 1999 records adding the required signals — proposal submitted for CEN validation; if confirmed, the REL-04 is not needed (~US$15k saving per recloser). Pulse/Vault
06

The economics of compliance

Meeting with Comulsa (E. Lorber, 11-Aug-2026): the technical paths and their costs are now confirmed. Our strategy optimizes each front — and the biggest piece is under CEN validation.

COMTRADE: avoiding the REL-04

The REL-02 only produces COMTRADE 1999; 2013 requires the REL-04 hardware upgrade (date TBD — end of 2026 / 2027). Our alternative: the Pulse/Vault pipeline standardizes the 1999 records and adds the required signals — proposal submitted for CEN validation.

  • If the CEN confirms it: ~US$15k saving per recloser
  • Reference: REL-02 ≈ US$3k; REL-04 considerably more + engineering + site work

Protections: the fboot file

The 30/90-min adaptation is an fboot file (IEC 61499 function-block logic) loaded into the RC10 — no hardware change.

  • Comulsa: file + on-site injection test ≈ US$2k per recloser
  • Alternative: confirm with CGE / Enel whether the test is required — if not, it's just uploading the file

GPS sync: local, not centralized

The conventional route is a centralized GPS server (~US$10k). Pulse-iris can act as a local Stratum-1 NTP server: a GPS receiver with PPS on its RS-232/USB port + chrony on its Debian image.

  • Hardware on the order of US$100 per site
  • Sufficient for COMTRADE UTC stamping; SITR's ±100 µs class: to be validated with utility/CEN
07

Milestones achieved

CEN Compliance is not a paper plan: every module has verifiable results in the field and before the Coordinator.

Technical meeting with Comulsa (11-Aug-2026) — confirmed: 30/90-min fix = IEC 61499 fboot file (~US$2k/recloser incl. testing); COMTRADE 2013 requires REL-04 (date TBD, end 2026/2027); centralized-GPS position ~US$10k.
COMTRADE pipeline field-proven — real records from Verona's RC10 extracted via FTP, validated and standardized (incl. a real Pickup record, 18-Jun).
24/7 binary-signal watcher — Modbus TCP on the RC10 (17 points every 2 s), event-driven extraction (≤1–2 min).
Solution filed with the CEN (06-Jul-2026) — before/after evidence, signal dictionary, dual binary formats and an SLRP integration proposal.
Complete fleet protections inventory — CMS exports + factory certificates for ~16 NOJA plants, verified against NTCO Tables 5/6.
Art. 9-11 compliance path confirmed in writing — Comulsa/NOJA IEC 61499 app on the REL-02, fleet compatibility confirmed (05-Aug-2026).
Audited SITR design (v3.0) — 6 plants against as-builts; per-plant integration pattern and gap BOM defined.
Deployment bundles ready — Puente, Calle Larga and Salerno (NOJA / Eaton / Tavrida adapters) packaged with installers and runbooks.
Live dashboards — COMTRADE repository, compliance status and per-plant events on the iEnergia portal.